PRODUCTS
+
  • 国家存储器基地C标段项目(一期)主体钢结构工程(1).png

Main Steel Structure Project of Bid Section C of National Memory Base (Phase I)

Keyword:

steel

co.

enterprise

project

scale

planned

building

truss

duration

Message
Project location: East Lake High tech Zone, Wuhan Planned duration: 2 months Structural system: steel truss Cooperative enterprise: China Construction Third Engineering Bureau Group Co., Ltd Building scale: 11010.43m2

PRODUCT DETAILS

国家存储器基地C标段项目(一期)主体钢结构工程

Project location: East Lake High tech Zone, Wuhan
Planned duration: 2 months
Structural system: steel truss
Cooperative enterprise: China Construction Third Engineering Bureau Group Co., Ltd
Building scale: 11010.43m2

Welcome to leave a message for consultation, and we will contact you in a timely manner!