English
搜索
Search

Hot search keywords: dumper system equipment | port machinery series | steel structure and grid

Wang Bin had a discussion with Feng Shuchen, deputy general manager of national energy group
Nepalese Prime Minister Deuba spoke highly of the progress and quality of Tana Lake Hydropower Station
Wang Bin attended the Symposium on the healthy development of the company
POWERCHINA WUHAN HEAVY EQUIPMENT CO.,LTD.

NEWS

Check category
/
/
/
The first unit of Nigeria's largest hydropower station officially generates electricity

The first unit of Nigeria's largest hydropower station officially generates electricity

  • Categories:Group highlights
  • Author:
  • Origin:
  • Time of issue:2022-03-29 14:44
  • Views:

(Summary description)OnMarch28,thefirstunitofZongluhydropowerstation,thelargesthydropowerstationinNigeria,officiallygeneratedelectricity.   Onebelt,oneroad,islocatedinthetownofzanggruuTown,Niger,Nigeria.Itismainlypowergeneration,andhasthecomprehensiveutilizationefficiencyoffloodcontrol,irrigation,watersupply,aquaculture,shipping.ItisthelargesthydropowerstationinNigeriaandtheimportantareaof"onebeltandoneroad"inAfrica.Theprojectalsosolvedtheemploymentproblemofover4000people.ThepowerstationisequippedwithfourverticalshaftFrancisturbinegeneratorunitswitharatedcapacityof175MW,withatotalinstalledcapacityof700MWandanaverageannualpowergenerationof2.64billionkwh

The first unit of Nigeria's largest hydropower station officially generates electricity

(Summary description)OnMarch28,thefirstunitofZongluhydropowerstation,thelargesthydropowerstationinNigeria,officiallygeneratedelectricity.   Onebelt,oneroad,islocatedinthetownofzanggruuTown,Niger,Nigeria.Itismainlypowergeneration,andhasthecomprehensiveutilizationefficiencyoffloodcontrol,irrigation,watersupply,aquaculture,shipping.ItisthelargesthydropowerstationinNigeriaandtheimportantareaof"onebeltandoneroad"inAfrica.Theprojectalsosolvedtheemploymentproblemofover4000people.ThepowerstationisequippedwithfourverticalshaftFrancisturbinegeneratorunitswitharatedcapacityof175MW,withatotalinstalledcapacityof700MWandanaverageannualpowergenerationof2.64billionkwh

  • Categories:Group highlights
  • Author:
  • Origin:
  • Time of issue:2022-03-29 14:44
  • Views:
Information
On March 28, the first unit of Zonglu hydropower station, the largest hydropower station in Nigeria, officially generated electricity.
 
 
 
One belt, one road, is located in the town of zanggruu Town, Niger, Nigeria. It is mainly power generation, and has the comprehensive utilization efficiency of flood control, irrigation, water supply, aquaculture, shipping. It is the largest hydropower station in Nigeria and the important area of "one belt and one road" in Africa. The project also solved the employment problem of over 4000 people. The power station is equipped with four vertical shaft Francis turbine generator units with a rated capacity of 175 MW, with a total installed capacity of 700 MW and an average annual power generation of 2.64 billion kwh
Keyword:

RELATED INFORMATION

What
2023-03-10

What factors affect the price of mining lighting fixtures in china

The price of mining lighting fixtures in china is affected by many factors, and we need to make a comprehensive analysis when we pay attention to and understand. This article will introduce to you what aspects of the price of mining lighting fixtures in china are affected?
See more information
Precautions
2023-03-01

Precautions for purchasing good price and quality mining lighting fixtures

When choosing good price and quality mining lighting fixtures, not only should the lighting requirements meet the requirements, but also dustproof, waterproof and other factors, and even explosion-proof requirements.
See more information
Installation
2023-02-17

Installation requirements for mining lighting fixtures

1. First of all, check whether the mining lighting fixtures are complete or not and the accessories are complete. 2. When installing mining lighting fixtures or replacing accessories, be sure to disconnect the power supply first. When connecting the power supply, pay attention to the adaptation of the input voltage to the high bay lamp. After the power cord is connected, it must be properly waterproofed and insulated.
See more information
Previous page
1
2
8

MESSAGE CONSULTATION

Username used for comment:
客户留言
Description:
验证码

POWERCHINA WUHAN HEAVY EQUIPMENT CO.,LTD.

Tel.: +86-27-68888412      Fax: 027-88113825

Address: No.1 Baishazhou special, Wuchang District, Wuhan, Hubei Province zip code: 430065

Copyright © China Power Construction Group Wuhan Heavy Industry Equipment Co., Ltd.    SEO

鄂ICP备20000970号-1    website construction: CE300 Wuhan